The Dubai Metro carried 294.7 million riders on the Red and Green lines in 2025, up 7 per cent on 2024, per the RTA's 2025 ridership release. That is 37 per cent of every trip made on public transport, shared mobility and taxis in Dubai. BurJuman was the busiest station, with 17.8 million riders.

This page collects every Dubai Metro statistic we could trace to an RTA release, the Dubai Media Office or the Gulf press from 2020 to October 2026. It covers ridership by year and by station, the COVID years, peak days, the fleet, safety, the April 2024 floods, the economic case, property prices near stations, and the Blue and Gold lines. Older figures appear where they show a trend.

A few numbers on this page are our own arithmetic, such as daily averages worked out from annual totals. Each one is marked "our calculation". Everything else comes from the source linked beside it.

Dubai Metro statistics at a glance

Headline Dubai Metro statistics. Sources are linked in each section below.
StatisticFigure
Riders in 2025294.7 million, the highest year on record
Share of Dubai trips, 202537 per cent of public transport, shared mobility and taxi riders
Riders, first half of 2026about 136.5 million, a 39.2 per cent share
Busiest station, 2025BurJuman, 17.8 million riders
Busiest night1,249,636 riders on New Year's Eve 2025
Fleet and network129 trains, 53 stations, about 90 km
Punctuality99.7 per cent
Camerasabout 9,000 (September 2025)
Blue LineAED 20.5 billion contract, opening September 2029
Gold Lineabout AED 34 billion, opening 9 September 2032

Annual Dubai Metro ridership, 2012 to 2025

Dubai Metro ridership fell by 44 per cent in 2020 and has set a new annual record every year from 2022 to 2025. The 2025 total was 45 per cent above the 2019 figure, the last year before COVID (our calculation).

Dubai Metro riders per year, Red and Green lines. 2012 to 2022 from the Dubai Media Office two-billion-rider release (April 2023); 2023 to 2025 from the RTA annual releases linked below. Growth and daily averages are our calculation.
YearRidersChange on previous yearAverage per day
2012109.049 millionN/A297,948
2013137.759 million+26.3 per cent377,422
2014164.307 million+19.3 per cent450,156
2015178.646 million+8.7 per cent489,441
2016191.325 million+7.1 per cent522,746
2017200.752 million+4.9 per cent550,005
2018204.405 million+1.8 per cent560,014
2019202.978 million-0.7 per cent556,104
2020113.626 million-44.0 per cent310,454
2021151.255 million+33.1 per cent414,397
2022225.142 million+48.8 per cent616,827
2023260 million+15.5 per cent712,329
2024275.4 million+5.9 per cent752,459
2025294.7 million+7.0 per cent807,397

Our 2022 daily figure matches the official one. The Media Office said average daily ridership "surpassed 616,000 riders in 2022", and dividing the annual total by 365 gives 616,827. The RTA's own growth figures, rounded, were "nearly 49 per cent" for 2022, 15 per cent for 2023, 6 per cent for 2024 and 7 per cent for 2025.

The sources for 2023 to 2025 are the RTA releases for 2023 (February 2024), 2024 (February 2025) and 2025 (February 2026).

Ridership counts trips, not people. A commuter who rides to work and back counts twice.

The Metro's share of Dubai public transport

The Metro carries more riders than any other mode in Dubai. Its share of combined public transport, shared mobility and taxi ridership rose from about a third in 2020 to almost 40 per cent in the first half of 2026.

Dubai Metro share of all public transport, shared mobility and taxi riders, per RTA annual and half-year releases. The 2020 share is our calculation from the 2020 release.
PeriodMetro ridersAll modesMetro shareAll modes per day
2020113.63 millionabout 346 millionabout 33 per centabout 947,000
2021151.3 millionabout 461 million33 per cent1.3 million
2022225.1 million621.4 million36 per cent1.7 million
2023260 millionabout 702 million37 per cent1.92 million
2024275.4 million747.1 million37 per centover 2 million
2025294.7 million802.1 million37 per cent2.2 million
H1 2026about 136.5 millionabout 348.1 million39.2 per centabout 1.9 million

In 2025 taxis took 26 per cent of the total and buses 25 per cent, per the 2025 release. In 2021 taxis carried slightly more riders than the Metro: 34 per cent against 33 per cent, per the 2021 release. The Metro has led every year since.

The 2020 figures come from the RTA's 2020 release (February 2021) and the 2022 figures from the 2022 release (February 2023).

Half-year Dubai Metro ridership, 2023 to 2026

The RTA publishes half-year and full-year figures. We found no official quarterly Metro totals.

Dubai Metro riders, January to June, per RTA half-year releases. Daily averages are our calculation.
PeriodMetro ridersMetro shareMetro riders per dayBusiest month (all modes)
H1 2023123.4 million36.5 per centabout 681,800March, about 60 million
H1 2024133 million37 per centabout 730,800January, 65 million
H1 2025about 143.9 million36.5 per centabout 795,000May, 68.8 million
H1 2026about 136.5 million39.2 per centabout 754,100January, 73.4 million

The sources are the RTA half-year releases for 2023, 2024, 2025 and 2026.

Metro ridership fell in the first half of 2026, after rising in every half-year the RTA reported from 2023 to 2025. Total trips across all modes dropped 12 per cent, from 395.3 million to 348.1 million, and Metro riders fell from 143.9 million to 136.5 million. The National linked the drop (August 2026) to the regional conflict that began on 28 February, which cut tourism and moved many people to remote work and distance learning.

January 2026 still had 73.4 million riders across all modes, the highest monthly figure in any RTA half-year release since 2023.

The Metro lost riders more slowly than other modes. A 5.1 per cent fall in Metro riders against a 12 per cent fall overall is why its share rose to 39.2 per cent (our calculation).

Busiest Dubai Metro stations

BurJuman has been the busiest Dubai Metro station every year since at least 2021. It is an interchange, where the Red and Green lines meet, so riders changing lines add to its count. Al Rigga carried more riders than Union in 2024 and 2025, though Union was narrowly ahead again in the first half of 2026.

Riders per station, in millions, per the RTA annual and half-year releases linked in the sections above. A dash means the release gave no figure for that station.
StationLine2022202320242025H1 2026
BurJumanRed and Green131516.217.88.4
Al RiggaRed9.911.71313.86.4
UnionRed and Green10.811.912.913.66.5
Mall of the EmiratesRed9.611about 11.211.25.2
Burj Khalifa / Dubai MallRed8.8over 10about 10.610.9N/A
Sharaf DGGreen7.79.39.910.54.9
Baniyas SquareGreen7.38.28.48.43.8
Business BayRed8.5N/AN/AN/A5
StadiumGreen5.66.36.87.5about 3.7

BurJuman's riders grew 37 per cent between 2022 and 2025 (our calculation). In 2021 the RTA published figures for only the top three: BurJuman about 8.8 million, Union about 7.5 million and Al Rigga 7 million.

Two naming notes. Sharaf DG in this table is the Green Line station (G25), formerly Al Fahidi, not the Red Line station that once carried the same name. Baniyas Square appears as "Baniyas" in some releases.

Do not add station figures together to estimate network ridership. A trip that starts at one station and ends at another may be counted at both, and interchanges also count riders changing lines.

Dubai Metro and COVID-19

The 2020 total of 113.626 million riders was the lowest since 2012.

Dubai Metro operations during COVID-19, per the RTA and the Gulf press.
Date or periodWhat happenedSource
29 March to 5 April 2020Metro suspended from 8pm to 6am daily during the National Disinfection ProgrammeRTA
April 2020Metro and Tram suspended for a two-week, 24-hour sterilisation periodGulf News
26 April 2020Service resumed, 7am to 11pm (10am to 11pm on Fridays)Dubai Media Office
2020Public transport kept at 70 per cent of capacityGulf Business
202074.455 million riders on the Red Line and 39.172 million on the Green LineRTA 2020 release

During the pandemic the RTA sanitised its whole fleet of 79 trains each working day and disinfected 47 stations daily, per Gulf News (September 2020).

The recovery was slow at first. The busiest single day between March 2020 and September 2021 came on a Thursday in September 2021, with 458,060 Metro riders. That was 311,090 on the Red Line and 146,970 on the Green Line, per Khaleej Times (September 2021). The Metro passed its 2019 total in 2022.

Cumulative riders and long-term growth

  • Over 2 billion riders travelled between September 2009 and January 2023: about 1.342 billion on the Red Line and 673.531 million on the Green Line, per the two-billion-rider release (April 2023).
  • About 2.4 billion riders had travelled by the Metro's 15th anniversary in September 2024, per the 15-year release.
  • Over 2.5 billion riders had travelled by June 2025, per The National.
  • "Nearly three billion" passengers had travelled by September 2026, per RTA Director General Mattar Al Tayer at a RailX Dubai press conference, reported by Khaleej Times. The RTA has not issued a release marking 3 billion.

The 15-year release adds more long-run numbers:

  • daily riders grew from 20,000 on the first day of service (10 September 2009) to 767,000 on 3 September 2024
  • the busiest days, on New Year's Eve and major holidays, reached "up to 900,000 riders", although the RTA's own New Year's Eve counts were already higher (see below)
  • trains had made 4.3 million trips and covered 26.8 million kilometres

New Year's Eve ridership

The RTA names New Year's Eve among the Metro's busiest days of the year. On the night of 31 December 2025 the Metro carried 1,249,636 riders. That is the highest New Year's Eve figure the RTA has published, and 38 per cent above the pre-COVID night of 31 December 2019 (our comparison).

Dubai Metro riders on New Year's Eve, Red and Green lines. Growth is our calculation.
NightMetro ridersChangeAll RTA modesSource
31 Dec 2019907,411N/A2,126,417Gulf Business
31 Dec 2021640,175N/A1,631,861Khaleej Times
31 Dec 2022958,161+49.7 per cent2,166,821Gulf News
31 Dec 2023974,416+1.7 per cent2,288,631Gulf News
31 Dec 20241,133,251+16.3 per cent2,502,474Dubai Media Office
31 Dec 20251,249,636+10.3 per cent2,836,859Dubai Media Office

We found no Tier 1 or Tier 2 figure for 31 December 2020. The Dubai Tram carried 58,052 riders on the night of 31 December 2025.

Eid and holiday ridership

Dubai Metro riders during public holiday breaks.
HolidayDatesMetro ridersAll modesSource
Eid Al Fitr 202410 to 12 April2.32 millionabout 5.9 millionGulf News
Eid Al Adha 202415 to 18 June2.5 millionover 6.7 millionDubai Media Office
Eid Al Etihad 202430 Nov to 3 Dec3,037,8838,001,724Gulf News
Eid Al Fitr 202530 Mar to 1 Apr2.43 million6.39 millionGulf News
Eid Al Adha 20255 to 8 June2.8 million7.6 millionGulf News
Eid Al Adha 202625 to 29 May3.3 million8.2 millionKhaleej Times

Holiday breaks vary in length, so compare riders per day rather than totals. On that basis, Eid Al Etihad 2024 averaged about 759,000 Metro riders a day over four days, against about 660,000 a day over the five days of Eid Al Adha 2026 (our calculation).

Expo 2020 and Route 2020

Route 2020 extended the Red Line from Jebel Ali (now National Paints) to the Expo site. It cost AED 11 billion, per Gulf News (July 2020).

Route 2020 at a glance, per Gulf News (July 2020), Khaleej Times and the Dubai Media Office.
ItemFigure
Length15 km: 11.8 km elevated, 3.2 km underground
Stations7
Capacity46,000 riders per hour in both directions
Residents servedabout 270,000
First passenger service1 January 2021, four stations
Dubai Investment Park and Expo 2020 stationsopened 1 June 2021
Jumeirah Golf Estates stationopened 1 September 2021
Forecast riders125,000 a day in 2021, 275,000 a day by 2030

Route 2020 started quietly. It recorded 27,043 trips between January and April 2021, before the Expo station opened, per Khaleej Times (June 2021). The four months ranged from 6,287 trips in February to 6,986 in March.

During Expo 2020 Dubai, from 1 October 2021 to 31 March 2022, the Metro service to Expo carried 8.203 million riders and ran 5.717 million kilometres. The RTA ran 87 trains, one every 2 minutes 30 seconds, per the Dubai Media Office (April 2022). RTA services recorded 37.3 million uses to and from Expo in total.

Jumeirah Golf Estates station covers 28,700 square metres and was designed for 11,555 riders an hour at peak, per the Dubai Media Office (August 2021).

Fleet, trains and network size

The Dubai Metro has grown from 10 stations to 53 since 2009. The table uses the RTA's own figures from the 15-year release (September 2024).

Dubai Metro network growth, per the RTA. The 15-year release gives 736,000 for 3 September 2024 and about 730,000 as the daily average that year.
Measure20092024
Trains79129
Stations1053
Network length52 km90 km
Riders per day20,000 (first day)767,000 (3 September 2024)

The 50 trains added for Route 2020 were Alstom Metropolis trainsets with five cars each, built in Katowice, Poland. Each carries up to 696 passengers, per Alstom (July 2020). Fifteen were assigned to the Expo route and 35 to the wider network. They raised capacity per train by 8 per cent, from 643 to 696 passengers, per Gulf News (July 2020).

The Blue Line will grow the combined Metro and Tram fleet from 140 to 168 trains, per the RTA's Blue Line contract release (December 2024).

Service, punctuality and staff

  • The Metro runs at 99.7 per cent on-time performance, per Gulf News (September 2025). The RTA quoted the same figure in its two-billion-rider release (April 2023).
  • The RTA was running trains at two-minute headways in December 2024, per Gulf News (December 2024).
  • By September 2025 a third Red Line route was running: trains between Centrepoint and Al Fardan Exchange run every 2 minutes at peak (7am to 9am and 4pm to 7pm). The RTA says this raised Red Line capacity by 12 per cent, per Gulf News (September 2025).
  • All 79 original trains have been fully refurbished, and 189 km of rail has been ground, per Gulf News (December 2024).
  • About 1,800 people work across operations, maintenance and safety. The control room has 20 staff per shift around the clock, per Gulf News (September 2025).
  • The operating company employs 228 UAE citizens, per the 15-year release.
  • Keolis-MHI runs the Metro and Tram under a 15-year contract (9 base years plus 6 renewable), taking on 1,850 staff, per the Dubai Media Office (September 2021).
  • The Metro and Tram scored 96 per cent on the International Customer Experience Standard in 2024, up from 92.2 per cent in 2023 and 87.2 per cent in 2022, per the Dubai Media Office (December 2024).

Safety and enforcement

The Dubai Metro control centre watched live feeds from about 9,000 cameras for around 850,000 daily passengers in September 2025, per Gulf News. In 2020 the figure was 8,700 cameras across Metro stations, per Khaleej Times (November 2020).

The RTA recorded "no cases of deliberate damage or vandalism" on the Metro in recent years, per the 15-year release (September 2024).

In the first half of 2026 the RTA made more than 1.6 million inspections across passenger transport. Over 1.2 million of them were in the public transport sector, which recorded over 28,000 violations and a compliance rate of about 97.8 per cent. Across all passenger transport, violations fell 21 per cent, from about 38,000 to about 30,000, per Khaleej Times (September 2026). These figures are not broken out for the Metro alone.

Fines run from AED 100 for minor breaches to AED 2,000 for damaging Metro property or misusing emergency equipment, per Gulf News (August 2025). Our rules and fines guide lists them in full.

The April 2024 floods

The storm of 16 April 2024 was the heaviest rainfall in the UAE since records began in 1949. Al Ain recorded 254mm in 24 hours, per The National (May 2024).

Dubai Metro flood disruption, April and May 2024.
DateWhat happenedSource
17 April 2024Limited Red Line service in three sections only: Centrepoint to GGICO, BurJuman to World Trade Centre, Jebel Ali to Expo 2020Gulf News
19 April 2024Over 400 pumps, 300 tanks, 200 heavy equipment units and 2,500 response staff deployedDubai Media Office
4 May 2024Onpassive, Equiti, Mashreq and Energy stations still closedThe National
8 May 2024More than 150 replacement buses on three routes; full service promised by 28 MayRTA
19 May 2024Onpassive, Equiti and Mashreq reopenedGulf Business
25 May 2024All stations back in operationGulf Business

Three of the four stations were closed for 33 days, from 16 April to 19 May (our calculation). Energy reopened by 25 May. The RTA did not publish a repair cost. Several of these stations have since been renamed: Mashreq is now InsuranceMarket, and Onpassive is being renamed Garmin.

Energy and the environment

  • Between 2009 and the end of 2020, the Metro removed about one billion private car trips. It cut carbon dioxide by 2.6 million tonnes, per the RTA chief in Khaleej Times (January 2022).
  • The Metro cut road travel by about 29.8 billion kilometres over sixteen years, per a McKinsey study for the RTA reported by the Dubai Media Office (October 2025).
  • Solar panels on the Metro and Tram depots total 9.959 MW, per Gulf News (November 2023). That is 3.165 MW at Jebel Ali Metro Depot, 3.804 MW at Al Qusais Metro Depot and 2.990 MW at Al Sufouh Tram Depot.
  • The RTA fitted 19,968 LED lights across the Metro, saving 16.7 million kilowatt-hours and AED 7.6 million over two years, per Gulf News (August 2025). The two phases cut 2,142 and 5,141 tonnes of carbon.

The economic case for the Dubai Metro

These are measured or reported figures. Forecasts are in the next list.

  • The Metro reached break-even between benefits and costs in 2016, per RTA Director General Mattar Al Tayer, reported by the Dubai Media Office (January 2024).
  • The Metro produced cumulative benefits of AED 115 billion from 2009 to the end of 2020, per Khaleej Times (January 2022).
  • All RTA projects together produced AED 262 billion in cumulative savings from 2006 to 2023, mainly in time and fuel, against AED 140 billion invested. This figure comes from the same January 2024 release and is not Metro-only.
  • A McKinsey study for the RTA found AED 319 billion saved in fuel and time costs since 2005, and AED 156 billion added to GDP, per the Dubai Media Office (October 2025). The study found a 6 to 16 per cent rise in property prices across Dubai, driven mainly by closeness to Metro stations and major roads. These are RTA-wide figures, not Metro-only.

Forecasts (not yet measured):

  • the existing Metro is projected to return AED 4.3 for every dirham spent by 2030 (January 2024 release)
  • the Blue Line is expected to deliver AED 56.5 billion in benefits by 2040, or AED 2.60 per dirham invested (December 2024 release)
  • the Gold Line is forecast to return 430 per cent over 20 years of operation (April 2026 release)

Property prices near Dubai Metro stations

One of the most detailed studies is CBRE's Dubai Metro Report 2023 (April 2023). It covered close to 74,000 sales transactions from 2010 to 2022 and about 112,000 rental contracts from 2018 to 2022, all along the Red Line. It did not study the Green Line.

Change in average residential prices and rents by walking time to a Red Line station, per CBRE. Prices cover Q1 2010 to Q4 2022; rents cover Q1 2018 to Q4 2022.
Walking time to stationPrice changeRent change
0 to 5 minutes+35.8 per cent+0.9 per cent
5 to 10 minutes+0.2 per cent-0.5 per cent
10 to 15 minutes+43.8 per cent+11.7 per cent
All within 15 minutes+26.7 per cent+5.7 per cent
Dubai average+24.1 per cent-4.1 per cent

The pattern is not a simple "closer is better". Homes 5 to 10 minutes from a station barely rose in price, while those 10 to 15 minutes away rose the most. CBRE's report shows these as historical changes, not proof that the Metro caused them.

Rents moved very differently by community within 15 minutes of a station, per CBRE:

Rent change by community within a 15-minute walk of a Red Line station, Q1 2018 to Q4 2022, per CBRE.
CommunityRent change, Q1 2018 to Q4 2022
City Walk+55.4 per cent
Downtown Dubai+49.7 per cent
Business Bay+20.8 per cent
Dubai Marina+15.1 per cent
Al Furjan-0.6 per cent
Barsha Heights-15.1 per cent
Discovery Gardens-35.0 per cent

Distance to a station is only one factor in rents. Reidin-GCP data reported by Gulf News (March 2024) found the rent gap between buildings near and far from a station was only about 3 per cent in Dubai Marina and Business Bay and about 6 per cent in Downtown. In JLT and Al Furjan, tenants next to a station could pay up to 30 per cent more.

CBRE also put Dubai car ownership in context: five in ten Dubai residents own a car, against 1.5 in ten in Singapore and three in ten in London.

Blue Line property statistics

Rents in nine communities on the planned Blue Line rose 23 per cent on average between the November 2023 announcement and June 2025, per Betterhomes data reported by Khaleej Times (June 2025).

Rent changes in Blue Line communities, November 2023 to June 2025, per Betterhomes via Khaleej Times.
CommunityRent change
Academic City+43 per cent
Dubai Creek Harbour+30 per cent
Al Warqa+28 per cent
Dubai Silicon Oasis+28 per cent
International City 1 and 2+22 per cent
Ras Al Khor Industrial+21 per cent
Mirdif and Festival City+15 per cent

In Academic City, studio rents rose from AED 42,000 to AED 60,000 a year. The rise partly reflects Dubai's wider rental market over the same period, so not all of it is due to the Blue Line.

Developers moved fast after the announcement. Property Monitor counted just over 11,500 off-plan units launched in Blue Line areas, with a combined sales value of AED 25 billion, per Khaleej Times (December 2023).

The RTA expects the Blue Line to lift land and property values near its stations by up to 25 per cent, per its December 2024 release. It forecasts up to 20 per cent for the Gold Line, per the April 2026 release. These are RTA projections, not measured results.

Blue Line and Gold Line statistics

Planned Dubai Metro lines, per the RTA Blue Line contract release (December 2024), the November 2025 progress release for the Blue Line opening date, The National (November 2023) for the Blue Line station split, and the Gold Line approval release (April 2026). The Gold Line release gives 18 stations in its headline and 15 locations in its text.
ItemBlue LineGold Line
Length30 km (15.5 km underground, 14.5 km elevated)42 km, fully underground
Stations14 (9 elevated, 5 underground)18
CostAED 20.5 billion contractabout AED 34 billion
Opening target9 September 20299 September 2032
Forecast riders per daynearly 200,000 by 2030; 320,000 by 2040465,000 beyond 2040
InterchangesCentrepoint (Red), Al Khor (Green), International City 1Business Bay and Jumeirah Golf Estates (Red), Al Ghubaiba (Green), Meydan and Jumeirah Golf Estates (Etihad Rail)

The Blue Line was first approved at AED 18 billion in November 2023, per The National. The contract awarded in December 2024 to MAPA, LIMAK and CRRC was AED 20.5 billion.

Construction progress, per the Dubai Media Office (November 2025):

  • Blue Line work was 10 per cent complete five months after the June 2025 groundbreaking, with a target of 30 per cent by the end of 2026
  • more than 500 engineers and 3,000 workers were working across 12 sites
  • the project had logged over 3 million work hours with no fatalities

The Blue Line's Emaar Properties station will be the highest Metro station in the world, at 74 metres, per The National (June 2025). The line will cross Dubai Creek on a 1,300 metre bridge.

When the Gold Line opens, the network will reach 162 km and 85 stations, per the April 2026 release.

Station renames and naming rights

Gulf News lists 15 Dubai Metro station renames, including one still in progress, in its renames list (updated September 2026). Recent deals all run for 10 years:

The RTA does not publish what sponsors pay. The only published figure is from the first round of bids in 2008, covering 23 of 47 planned stations. It raised AED 1.804 billion, of which AED 900 million was financing for station construction, per Gulf News (December 2008).

Nol card and payment statistics

  • The nol Pay app passed 1.5 million downloads by the end of 2024, up over 150 per cent on 2023. More than 33,000 digital Nol cards were sold, a 460 per cent rise, per Gulf News (November 2025).
  • In the first half of 2025, top-ups at ticket vending machines fell 28 per cent while digital top-ups rose 20 per cent. Machine breakdowns fell 80 per cent, per Gulf News (August 2025).
  • The Nol card was accepted at 12,000 retail outlets in January 2022, per Khaleej Times.

The RTA does not publish how many Nol cards are in circulation. For card prices and types, see our Nol card guide.

How Dubai residents travel

Public transport and shared mobility made up 22.3 per cent of trips in Dubai in 2025, up from 6 per cent in 2006. The RTA's target is 25 per cent by 2030, per the H1 2026 release. The share was 21.6 per cent in 2024, per the H1 2025 release.

Car numbers are growing faster. Registered vehicles in Dubai rise by about 10 per cent a year, against 2 to 3 per cent worldwide, per Gulf News (February 2026). About 3.5 million vehicles are on Dubai's roads in the daytime, per Khaleej Times (August 2025).

The RTA is improving walking and cycling routes to stations, per Gulf News (July 2026):

  • around 37 Metro stations have upgraded walking and cycling links so far
  • the plan targets 63 Metro and bus stations, and 25 more communities for a total of 34, by 2030
  • in 2025 there were 342 million pedestrian trips (+5 per cent), 57.3 million cycling trips (+23 per cent) and 39.6 million e-scooter trips (+23 per cent)

The three park and ride sites, at Centrepoint, National Paints and Etisalat by e&, hold more than 8,000 vehicles, per Gulf News (September 2026). The RTA does not publish how many are used.

Centrepoint is the park and ride site at the eastern end of the Red Line.

From a Dubai resident

One of three Metro stations with a free multi-storey car park. People driving in from the Sharjah or Mirdif side park free by tapping a Nol card at the barrier, then ride into the city and skip central parking charges. The F10 feeder bus links the station to Dubai Safari Park.

What the RTA does not publish

Some Dubai Metro statistics that readers ask for are not public. We found no Tier 1 or Tier 2 figure for any of these:

  • Red Line and Green Line annual totals after 2020
  • quarterly Metro ridership
  • riders per station for most of the 53 stations
  • Gold Class and Women and Children carriage use
  • the number of Nol cards in circulation
  • naming-rights payments since 2008
  • park and ride occupancy
  • Metro crime figures since 2020
  • the cost of the 2024 flood repairs

If one of these appears in an official release, we will add it to this page.

Sources and how we checked them

Every figure on this page comes from an RTA release (most republished by the Dubai Media Office), Gulf News, Khaleej Times, The National, Gulf Business, Alstom, or the CBRE report named in the text. Each table and list names its source. Where two official figures disagree, we use the later one and say so.

Figures marked "our calculation" are our arithmetic from the official totals, not RTA figures. We re-check this page when the RTA publishes new annual or half-year ridership, usually in February and August.

Dubai Metro Planner is independent and not affiliated with the RTA. Confirm current fares, timings and rules with the RTA before you travel.